2024-01 |
Electric vehicle charging scheduling with mobile charging stations |
Journal of Cleaner Production
|
2023-05 |
Robust optimization model for the electric vehicle routing problem under battery energy consumption uncertainty with arc segmentation |
International Journal of Sustainable Transportation
|
2022-12 |
3PL을 활용한 해군 격오지 부대 배송 최적화 모형 |
한국SCM학회지
|
2021-03 |
Waiting strategy for the vehicle routing problem with simultaneous pickup and delivery using genetic algorithm |
EXPERT SYSTEMS WITH APPLICATIONS
|
2021-01 |
Sustainable part consolidation model for customized products in closed-loop supply chain with additive manufacturing hub |
Additive Manufacturing
|
2020-10 |
혼합정수계획법을 활용한 전시상황에서의 효율적인급수분배계획 |
한국SCM학회지
|
2020-05 |
다품종 혼류 생산라인의 생산계획에 관한 연구: 자동차 카메라 생산라인을 중심으로 |
한국SCM학회지
|
2020-02 |
물류비용 최소화를 위한 해군 물류 아웃소싱 계획 모델 |
대한산업공학회지
|
2019-05 |
Optimal Operational Strategy for Power Producers in Korea Considering Renewable Portfolio Standards and Emissions Trading Schemes |
ENERGIES
|
2019-03 |
한국 국채 선물 시장에서 러프 집합 이론을 기반으로 한 투자 전략의 최적화 |
한국데이터정보과학회지
|
2019-02 |
Tactical Supply Planning in Smart Manufacturing Supply Chain |
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING
|
2018-09 |
Robust optimization model for closed-loop supply chain planning under reverse logistics flow and demand uncertainty |
JOURNAL OF CLEANER PRODUCTION
|
2018-04 |
Closed-Loop Supply Chain Planning Model of Rare Metals |
SUSTAINABILITY
|
2017-11 |
Two-Stage Integer Programming Model for Building Retrofit Planning for Energy Saving in South Korea |
SUSTAINABILITY
|
2016-06 |
Closed-Loop Supply Chain Planning Model for a Photovoltaic System Manufacturer with Internal and External Recycling |
SUSTAINABILITY
|
2016-03 |
제조 패러다임의 변화 : 스마트제조 |
ie 매거진
|
2016-01 |
Management of Smart-Technology Market by Diffusion of Front Loading Innovation |
JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH
|
2015-07 |
Measuring greenhouse gas emissions for the transportation sector in Korea |
ANNALS OF OPERATIONS RESEARCH
|
2015-03 |
Defense IT convergence in South Korea |
Indian Journal of Science and Technology
|
2014-12 |
ANALYSIS OF SUPPLY CHAIN NETWORK BY RULES OF ORIGIN IN FTA ENVIRONMENT |
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE
|
2014-12 |
Profit Analysis and Supply Chain Planning Model for Closed-Loop Supply Chain in Fashion Industry |
SUSTAINABILITY
|
2014-08 |
국내 RFID 시장의 확산 분석 및 예측 모형 |
대한산업공학회지
|
2014-06 |
Supply chain surplus: comparing conventional and sustainable supply chains |
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL
|
2014-05 |
국내 제조업에서의 Green SCM 도입 절차에 대한 고찰 |
한국SCM학회지
|
2014-04 |
A Heuristic for Disassembly Planning in Remanufacturing System |
SCIENTIFIC WORLD JOURNAL
|
2014-02 |
An Adaptive Evolutionary Algorithm for Traveling Salesman Problem with Precedence Constraints |
SCIENTIFIC WORLD JOURNAL
|
2013-12 |
군 통합 물류센터의 최적 위치 결정 |
대한산업공학회지
|
2013-03 |
FTA 환경에서 ODM-OEM Hybrid 형태의 섬유류생산시스템의 공급망 분석 |
경영과학
|
2012-12 |
환자의 중증도 분류를 고려한 응급실의 진료 프로세스 패턴 분석 |
한국경영과학회지
|
2012-11 |
국방IT융합 추진방법론 및 사례 연구 |
한국IT서비스학회지
|
2012-09 |
국내 공공기관 콜센터의 확산에 관한 연구 |
산업공학(IE Interfaces)
|
2012-04 |
재난 상황에서의 차량 운송 체계 및 시뮬레이션 연구 동향 |
한국통신학회지 (정보와 통신)
|
2010-12 |
지역사회경험학습과 공학설계교육 |
공학교육연구
|
2010-12 |
국방정보시스템의 진화적 획득전략 |
한국IT서비스학회지
|
2010-12 |
기술거래 네트워크에서의 기술제공자 선택 모델 |
기술혁신연구
|
2010-05 |
제조산업의 그린생산원가 산출모형 |
한국SCM학회지
|
2010-05 |
국내 산업의 최적 온실가스 할당량 결정 연구 |
한국SCM학회지
|
2008-12 |
Joint Decision of Optimal Procurement Policy and Optimal Order Size for a Product Recovery System |
대한산업공학회지
|
2008-09 |
Decentralized supply chain planning framework for third party logistics partnership |
Computers & Industrial Engineering
|
2008-01 |
An order quantity negotiation model for distributor-driven supply chains |
International Journal Of Production Economics
|
2007-09 |
Product sequencing problem in Mixed-Model Assembly Line to minimize unfinished works |
COMPUTERS & INDUSTRIAL ENGINEERING
|
2007-03 |
Genetic algorithm-based integrated production planning considering manufacturing partners |
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
|
2006-10 |
Supply planning model for remanufacturing system in reverse logistics environment |
COMPUTERS & INDUSTRIAL ENGINEERING
|
2006-07 |
Heuristics for assembly operation scheduling problem in flexible assembly systems |
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
|
2006-03 |
기능성 제품시장을 위한 협업 에이전트 기반 공급사슬계획 |
산업공학(IE INTERFACES)
|
2006-03 |
다단계 생산시스템에서 재작업정책의 비교분석 |
대한산업공학회지
|
2003-12 |
생산 시스템에서 직접 원가 분석 모델 |
대한산업공학회지
|
2003-01 |
A Direct Cost Analysis Model in Manufacturing Systems |
대한산업공학회지
|
2002-12 |
전자 상거래에서의 인터넷 쇼핑몰의 비즈니스 평가 모델 |
경영과학
|
2002-12 |
공급사슬관리에서 안전재고 수준을 이용한 효율적인 납기회신 시스템의 개발 |
한국 SCM 학회지
|
2002-12 |
A QUALITY FORECASTING SYSTEM FOR GLASS MELTINGPROCESSES USING GENETIC ALGORITHMS |
TRANSACTIONS OF NMARI/SME
|
2002-11 |
반도체 웨이퍼 제조공정에서의 스케쥴링 규칙들의 성분석 |
한국시뮬레이션학회 논문지
|
2002-11 |
반도체 Probe공정에서의 생산능력계획 |
산업공학
|
2002-11 |
TFT-LCD 공정에서의 Color Filter의 경제적 Lot Size의 결정 |
산업공학
|
2002-11 |
Selection of Assembly Sequences based on FlexibleAssembly Systems Performance |
INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
|
2002-11 |
EVALUATION OF ASSEMBLY SEQUENCES USING GENERALIZEDFLEXIBLE ASSEMBLY SYSTEMS SCHEDULING PROBLEM |
MICROGRAVITY SCIENCE AND TECHNOLOGY
|
2002-07 |
An Available-to-promise System for TFT LCD Manufacturing in Supply Chain |
MICROGRAVITY SCIENCE AND TECHNOLOGY
|
2002-06 |
글로벌 SCM환경에서의 통합생산계획모델에 관한 연구 |
로지스틱스 연구
|
2002-03 |
Multi-criteria Evaluation of Assembly Sequences in Flexible Assembly Systems |
Journal of Design and Manufacturing Automation
|
2002-01 |
Development of an Efficient ATP System using Safety Stock Level in Supply Chain Management |
한국 SCM 학회지
|
2002-01 |
A Study on Integrated Production Planning Model in Global Supply Chain |
로지스틱스 연구
|
2002-01 |
A Causal Forecasting System using Genetic Algorithms in Supply Chain Management |
JOURNAL OF SYSTEMS AND SOFTWARE
|
2001-10 |
An Assembly Scheduler for TFT LCD Manufacturing |
MICROPROCESSORS AND MICROSYSTEMS
|
2000-12 |
공급사슬환경에서의 고객주문만족시스템 |
산업기술연구소 논문집
|
2000-11 |
전자상거래에서 인터넷 쇼핑몰의 비즈니스 평가 모델 |
경영과학
|
2000-11 |
연속생산공정에서의 유도형 유전알고리즘을 이용한 인과형 예측모델에 관한 연구 |
경영과학
|
2000-09 |
공급 사슬 경영에 있어서의 납기 회신 시스템 |
산업공학(IE INTERFACES)
|
2000-06 |
SCM최적화모듈의 모델링 |
산업기술연구소 논문집
|
2000-05 |
Multi-objective Production Scheduling of Probe Process in Semiconductor Manufacturing |
Production Planning and Control
|
2000-05 |
A Quality Forecasting System for Glass Melting Processes using Genetic Algorithms |
Transactions of NAMRI/SME
|
2000-03 |
유전 알고리즘을 이용한 유리 용해 공정에서의 불량 예측 시스템 |
산업공학(IE INTERFACES)
|
1999-05 |
반도체 웨이퍼 제조공정에서의 스케쥴링 규칙들의 성능분석 |
한국시뮬레이션학회 논문지
|
1997-05 |
Evaluation of Assembly Sequence using Generalized Flexible Assembly Systems Scheduling Problem |
COMPUTERS & INDUSTRIAL ENGINEERING
|
1997-05 |
반도체 Probe 공정에서의 생산능력계획 |
산업공학IE Interfaces지
|
1997-05 |
TFT LCD공정에서의 Color Filter의 경제적 Lot Size의 결정 |
산업공학IE Interfaces지
|
1997-03 |
반도체 Probe 공정에서의 생산 능력 계획 |
산업공학(IE INTERFACES)
|
1995-12 |
Selection of Assembly Sequences based on Flexible Assembly Systems Performance |
INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
|
1995-06 |
반도체 생산에서의 CIM 시스템 |
IE Magazine
|
1994-05 |
New Development of An Evaluation System Assembly Sequences for Ease of Assembly |
Transaction of NAMRI/SME
|